September 2022

Over the past month, both designs of the improvements at the Middle / High School and the Elementary School have taken significant strides forward.

At the Elementary School, detailed discussions about power, data, and audio/video have taken place as the room layouts are being finalized.

At the Middle/High School, edits and adjustments continue in some of the specific curriculum spaces, such as Art, Tech Ed, and Family and Consumer Science. Meanwhile, the rest of the building layouts are locked in.

Check out preliminary renderings of the Elementary School addition and interior spaces within the Middle / High School.